Change vehicle

Select Your Ute!

Use the dropdowns below to select your vehicle.

You will then be able to see what's available for your vehicle model once you have.

 

I have a

It's a

 from

 

START

 

CLOSE

SEARCH

CART

LOGIN

CONTACT US

1800 769 577

HOME
UTE HARD LID
UTE CANOPY
PRICING/UTE BUILDER
PRODUCT LEAD TIMES
HOW TO BUY
ABOUT
LEARNING CENTRE
  • ISO Certified
  • Support360
  • News
  • Videos
  • How much does a Utemaster Load-Lid cost?
  • Who makes the best Hard Lids in Sydney, New South Wales? (Reviews/Ratings)
  • How to install a Load-Lid™
  • Which Ute Tub Cover is best: Roller Shutter, Plastic, Aluminium, Fibreglass or Vinyl Tonneau?
HOME
UTE HARD LID
UTE CANOPY
PRICING/UTE BUILDER
PRODUCT LEAD TIMES
HOW TO BUY
ABOUT
About ISO Certified Support360 News Videos
LEARNING CENTRE
Learning Centre How much does a Utemaster Load-Lid cost? Who makes the best Hard Lids in Sydney, New South Wales? (Reviews/Ratings) How to install a Load-Lid™ Which Ute Tub Cover is best: Roller Shutter, Plastic, Aluminium, Fibreglass or Vinyl Tonneau?
DEALER LOGIN
CONTACT US
1800 769 577

Hit enter to search or ESC to close

Back

Your cart summary

Checkout
  • Product Lead Times

Product Lead Times

Utemaster products are manufactured in our state of the art facility based in New Zealand. The below lead times represent the maximum amount of time you should expect to wait for your order from date of order to dispatch from our warehouse. Often we will be able to deliver quicker than these time frames so if you have a time-critical project, contact us to discus your options. 

 

Standard Lead Times:

Load-Lid (Current Models):

4 Weeks

Load-Lid (Older Models):

10 Weeks

Centurion Canopy:

10 Weeks

Standard Lead Times:

Load-Lid (Current Models):  4 Weeks

Load-Lid (Older Models): 10 Weeks

Centurion Canopy:  10 Weeks

  

Lead Time From Stock:

We hold stock of most common models at our Sydney assembly facility. If your order is in stock we can ship it out to you as soon as payment has been received. We will advise at the time of order if it is in stock or if a standard lead time applies. 

 

Terms & Conditions

- We require payment in full before dispatch from our warehouse. If the product is for a previous shape vehicle we will require a deposit to get the order underay as these are not generally stocked items. For all products to suit current models a deposit isnot required. 

- Please allow extra time for freight and/or fitting on top of the above timeframes.

- This lead time may be subject to change.

 

Utemaster Sydney Building Office Branch Factory

Utemaster Back to top
  • Home
  • Ute Hard Lid
  • Ute Canopy
  • Pricing/Ute Builder
  • Product Lead Times
  • How To Buy
  • About
  • Learning Centre

Utemaster Aus Pty Limited 2022. All rights reserved Warranty Privacy & Legal

Follow us on social

  

 

Utemaster products are available to order direct or through our reseller network.

A map of our resellers can be found here:

Open Reseller Map

  

Utemaster Aus Pty Limited 2022. All rights reserved Warranty Privacy & Legal

LOGIN TO UTEMASTER

To access your account please enter your login details.

New to UteMaster? Sign up

I've lost my password

I've lost my password

SIGN UP TO UTEMASTER

For a personalised experience, enter your details below to create an account.

Already have an account? Log in here